Subfloor
3" teleposts, sill gaskets and plates, air barrier, built-up beams, floor joists, crossbridging, strapping, adhesive, 5/8" tongue and groove sheathing, nails.
Interior Walls
2x4 and 2x6 studs with nailers and plates, door lintels.
Gable Ends (On Trusses)
7/16" aspenite sheathing, air barrier, 1x 8 pine siding, staples, nails.
Gable Ends (On Frame)
All materials for Gable ends (On Trusses) plus 2x6 studs and plates (2x4 if applicable.)
Roof (On Trusses)
2x4 or 2x6 lookouts, 1/2" spruce sheathing, 1/2" H-clips, and 2x6 subfascia, 50 lb. rolled roofing, ice and water shield, metal drip edge, 20 year asphalt shingles, roof vents, nails, 24" valley flashing.
Roof (On Frame)
All materials for Roof (On Trusses) plus 2x8 rafters, 2x10 build-up for insulation , framing for joining roofs.
Dormers (Shed and Gable)
All materials as specified for Roof (On Frame) and Gable Ends (On Frame) plus 7" galvanized step flashing, 6" wall-to-roof flashing.
Soffits And Fascia
1x6 tongue and groove soffit, 2" continuous vent strip, trim, 1x8 pine fascia, nails.
Exterior Door Locks
One handleset for main entry and quality deadbolt locks for remaining exterior doors.
Tarping
All logs and lumber are tarped to protect materials from the elements. |